Lawn Process

Step 1

Excavate lawn to the depth of 75mm.

Step 2

Fill with crushed rock/roadbase 75mm and compact with vibrating plate to 50mm.

Step 3

Lay a layer of crushers dust and level with a rake and compact again with vibrating plate.

Step 4

Roll out your LSPT on the surface. Make sure that the piles run the same direction. Cut over-hanging lawn with a stanley knife. Join the rolls of grass together with LSPT tape.

Step 5

Once you have covered the whole area, pin with 100mm galvanised flathead nails.

Step 6

Sprinkle dry, washed, sand about 5mm deep over the laid lawn. A hard bristled broom can be used to sweep the sand into the base of the turf grass.